Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Yinyu |
Model Number : | WNS |
Certification : | ISO/BV |
Price : | $5,000.00-$10,000.00 |
Payment Terms : | L/C, T/T, Western Union |
Supply Ability : | 100 Qty/per month |
Delivery Time : | 10-30 work days |
For Greenhouse Fully Automatic System Control Environmental Gas Fired Steam Boiler
Greenhouse, also known as a warm room. A facility that can transmit
light, keep warm (or warm) and grow plants. In the season of
unsuitable plant growth, can provide greenhouse fertility period
and increase production, more used in low temperature season warm
vegetables, flowers, trees and other plants cultivation or
seedling. There are many kinds of greenhouses, depending on the
roof materials, lighting materials, shape and temperature
conditions can be divided into many kinds.
The types of greenhouses include greenhouse cultivation, greenhouse
farming, exhibition greenhouse, experimental greenhouse, catering
greenhouse, entertainment greenhouse, etc., greenhouse system
design includes heating system, insulation system, cooling system,
ventilation system, control system, irrigation system, etc.,
greenhouse is only simple plastic film and bone structure knot, its
internal facilities are few, no greenhouse requirements high.
Therefore, strictly speaking, greenhouse than the greenhouse
equipment requirements are higher, may need to use more advanced
instruments to strictly control the temperature.
product parameters
WNS2-1.25-YQ
NO; | Name | Unit | Number | Description |
1 | Rated evaporation | t/h | 2 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated outlet ℃ | ℃ | 193 | |
4 | Design efficiency | % | 92.6(Oil) 92.46(Gas) | |
5 | Boiler heat efficiency | % | More than 98% | |
6 | Design fuels | / | Light oil,Gas | |
7 | Fuels LHV | MJ/kg | 42.917(Oil) | |
MJ/Nm3 | 35.438(Gas) | |||
8 | Consumption of fuels | kg/h | 137.9(Oil) | |
Nm³/h | 167.325(Gas) | |||
9 | Radiation heating area | m² | 8.527 | |
Convection heating area | m² | 41.838 | ||
GGH heating area | m² | 23.195 | ||
10 | Fume temperature | ℃ | 137.863(Oil) | |
℃ | 134.28 (Gas) | |||
11 | Fume temperature | ℃ | 60-80 | |
12 | Excess air coefficient | / | 1.15 | |
13 | Volume | m3 | 5 | |
14 | Bulk weight | kg | 9700 | |
15 | Bulk size | mm | 4531×2150×2544 | |
16 | Chimney | mm | Φ500×10000 | |
17 | Total power consumption | KW | Oil:13,Gas:11 | |
18 | Combustion model | / | Micro positive pressure | Chamber combustion |
19 | Boiler structure feature(Three-pass structure) | Horizontal-type chamber combustion | ||
20 | Control way | Full automation/Manual | ||
21 | Ignition way | High-tension/Electrode |
WNS4-1.25-YQ
NO; | Name | Unit | Number | Description |
1 | Rated evaporation | t/h | 4 | |
2 | Rated working power | Mpa | 1.25 | |
3 | Rated outlet ℃ | ℃ | 194 | |
4 | Design efficiency | % | 92.06(Oil) 92.17(Gas) | |
5 | Boiler heat efficiency | % | More than 98% | |
6 | Design fuels | / | Light oil,Gas | |
7 | Fuels LHV | MJ/kg | 42.917(Oil) | |
MJ/Nm3 | 35.438(Gas) | |||
8 | Consumption of fuels | kg/h | 275.8(Oil) | |
Nm³/h | 334.65(Gas) | |||
9 | Radiation heating area | m² | 10.955 | |
Convection heating area | m² | 83.887 | ||
GGH heating area | m² | 21.488 | ||
10 | Fume temperature | ℃ | 140.6(Oil) | |
℃ | 137.75 (Gas) | |||
11 | Fume temperature | ℃ | 60-80 | |
12 | Excess air coefficient | / | 1.15 | |
13 | Volume | m3 | 5 | |
14 | Bulk weight | kg | 8000 | |
15 | Bulk size | mm | 4300×1900×2400 | |
16 | Chimney | mm | Φ400×10000 | |
17 | Combustion model | / | Micro positive pressure | Chamber combustion |
18 | Boiler structure feature(Three-pass structure) | Horizontal-type chamber combustion | ||
19 | Control way | Full automation/Manual | ||
20 | Ignition way | High-tension/Electrode |
Our services
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
![]() |